Varming Consulting Engineers were commissioned to design the mechanical and electrical services installations for the 6,000m2 Centre of Excellence which includes a state of-the-art butter production and packing facility and a Product Development, Innovation and Customer Presentation Centre. The facilities include 1,400m2 of office space, 800m2 cold store, 3,200m2 of production space with walk-on ceiling space and 600m2 of goods storage. Services include power, lighting, security, fire protection, air-conditioning and specialist ventilation, process water, compressed air, process cooling and medium temperature hot water.